RELEASED: Public: October 15, 2025
Resolved issues
- Failure to initiate clean Hazelcast termination during shutdown of loaded HA controller (BEE-62736)
-
When an HA controller was heavily loaded, a fixed-size thread pool could become busy and fail to schedule termination of Hazelcast networking. As a result, termination might not occur before the termination grace period on a managed controller expired, or before the process was halted.